Electric Power Supply

Electricity Unit


#
1 Present Electric Load (in KW)100kw
2 Date of Connection 19/03/2013
3 Connection in the name of Principal Loyola High school
4 Meter No. 137188 -HT
5 Seal No. CMA 36311891
6 Remarks LTIS connection 57 H.P in the name of the Loyola Industrial school and HTS 11 KVA of Loyola High school Have been converted into SD and enhanced up to 100 K W on 9-4-2013 in the name of Loyola High School
.

How you can help us

Just call at 0612-2262746